IS WORK OVER?

Automation index

How much of a Nuclear engineer’s job can AI already do?

A core model comes earlier. Running the plant and not playing with reactivity do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Nuclear engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Neutronics, thermal-hydraulics and the file.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Control room, tests and the set-point.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Licence, the regulator and the safety analyses.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Outage, reload and spent fuel.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
The event, safety culture and the report.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Not playing with reactivity, and signing the analysis.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • neutronics
  • thermal-hydraulics
  • nuclear licence
  • reload
  • safety analysis
  • control room
  • spent fuel
  • safety culture

Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149

Competition officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
File, the market and the lead.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Inspection, the email and the one that is deleted.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Cartel, the evidence and not stretching it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Fine, proportion and not sinking extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The board, the note and not leaking.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Catch the cartel, and not leaking.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • cartels
  • competition inspections
  • emails
  • fines
  • markets
  • leads
  • not leak
  • evidence

Sources for this job· O*NET 23-1022.00· ESCO/ISCO 2619

Analyse my job

Jobs with similar scores

  1. 295Museum educator24%
  2. 296Electrician24%
  3. 297Nurse24%
  4. 299Health inspector24%
  5. 300Interpreter24%
  6. 301Warehouse supervisor24%