Automation index
How much of a Nuclear engineer’s job can AI already do?
A core model comes earlier. Running the plant and not playing with reactivity do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nuclear engineer
24%
AI can already do 24% of this job.
#267 / 633
View rankingNuclear engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Neutronics, thermal-hydraulics and the file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Control room, tests and the set-point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Licence, the regulator and the safety analyses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Outage, reload and spent fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The event, safety culture and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not playing with reactivity, and signing the analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- neutronics
- thermal-hydraulics
- nuclear licence
- reload
- safety analysis
- control room
- spent fuel
- safety culture
Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149
IS WORK OVER?
Fashion designer
24%
#263 / 633
View rankingFashion designer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Moodboards, tech packs and sizes.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 48% | +9.6 |
Research trends and cost.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 35% | +5.6 |
Pattern, prototype and fit on a body.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Choose cloth, mill and real colour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Collection, lookbook and atelier relationship.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Brand taste and what does not ship.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- design interfaces
- prototypes
- figma
- Moodboards, tech packs and sizes
- Research trends and cost
- Pattern, prototype and fit on a body
- Choose cloth, mill and real colour
- Brand taste and what does not ship
- diseñador de moda
- fashion designer
Sources for this job· O*NET 27-1022.00· ESCO/ISCO 2163