Automation index
How much of a Nuclear engineer’s job can AI already do?
A core model comes earlier. Running the plant and not playing with reactivity do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nuclear engineer
24%
AI can already do 24% of this job.
#267 / 633
View rankingNuclear engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Neutronics, thermal-hydraulics and the file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Control room, tests and the set-point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Licence, the regulator and the safety analyses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Outage, reload and spent fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The event, safety culture and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not playing with reactivity, and signing the analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- neutronics
- thermal-hydraulics
- nuclear licence
- reload
- safety analysis
- control room
- spent fuel
- safety culture
Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149
IS WORK OVER?
Fashion model
15%
#625 / 633
View rankingFashion model
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Online castings, cards and diary.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Contracts, agency and invoices.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Pose, walk and last the set.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Care for body, skin and energy.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 8% | +1.3 |
Photographer, stylist and brand.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Public image and personal limits.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Online castings, cards and diary
- Contracts, agency and invoices
- Pose, walk and last the set
- Care for body, skin and energy
- Photographer, stylist and brand
- Public image and personal limits
- modelo de moda
- fashion model
- maniqui
Sources for this job· O*NET 41-9012.00· ESCO/ISCO 5241