IS WORK OVER?

Automation index

How much of a Nuclear engineer’s job can AI already do?

A core model comes earlier. Running the plant and not playing with reactivity do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Nuclear engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Neutronics, thermal-hydraulics and the file.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Control room, tests and the set-point.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Licence, the regulator and the safety analyses.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Outage, reload and spent fuel.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
The event, safety culture and the report.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Not playing with reactivity, and signing the analysis.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • neutronics
  • thermal-hydraulics
  • nuclear licence
  • reload
  • safety analysis
  • control room
  • spent fuel
  • safety culture

Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 303Museum educator24%
  2. 304Electrician24%
  3. 305Nurse24%
  4. 307Health inspector24%
  5. 308Interpreter24%
  6. 309Warehouse supervisor24%