Automation index
How much of a Nuclear engineer’s job can AI already do?
A core model comes earlier. Running the plant and not playing with reactivity do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nuclear engineer
24%
AI can already do 24% of this job.
#282 / 683
View rankingNuclear engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Neutronics, thermal-hydraulics and the file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Control room, tests and the set-point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Licence, the regulator and the safety analyses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Outage, reload and spent fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The event, safety culture and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not playing with reactivity, and signing the analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- neutronics
- thermal-hydraulics
- nuclear licence
- reload
- safety analysis
- control room
- spent fuel
- safety culture
Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149
IS WORK OVER?
Heritage interpreter
22%
#365 / 683
View rankingHeritage interpreter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Script, the group and the time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Room, the question and the one who will not listen.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The piece, the context and not making it up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
School group, the yard and getting them to touch carefully.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The director, capacity and not overcrowding.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they look at the stone, and not just the phone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tour scripts
- school groups
- pieces
- historical context
- capacity
- not make it up
- heritage
- guided visits
Sources for this job· O*NET 25-4012.00· ESCO/ISCO 2621