IS WORK OVER?

Automation index

How much of a Nuclear engineer’s job can AI already do?

A core model comes earlier. Running the plant and not playing with reactivity do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Nuclear engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Neutronics, thermal-hydraulics and the file.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Control room, tests and the set-point.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Licence, the regulator and the safety analyses.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Outage, reload and spent fuel.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
The event, safety culture and the report.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Not playing with reactivity, and signing the analysis.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • neutronics
  • thermal-hydraulics
  • nuclear licence
  • reload
  • safety analysis
  • control room
  • spent fuel
  • safety culture

Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149

Mountain guide

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Report, route and the kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Walk, pace and the one who drops.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Ground, snow and the yes or no to go on.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Bivouac, the surprise and not improvising anchors.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the ego and not pushing the summit.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come down whole, and not trusting the report alone.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • avalanche reports
  • mountain routes
  • group pace
  • bivouac
  • anchors
  • ground
  • summit
  • mountain kit

Sources for this job· O*NET 39-7011.00· ESCO/ISCO 5113

Analyse my job

Jobs with similar scores

  1. 264Museum educator24%
  2. 265Electrician24%
  3. 266Nurse24%
  4. 268Health inspector24%
  5. 269Interpreter24%
  6. 270Warehouse supervisor24%