Automation index
How much of a Nuclear engineer’s job can AI already do?
A core model comes earlier. Running the plant and not playing with reactivity do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nuclear engineer
24%
AI can already do 24% of this job.
#267 / 633
View rankingNuclear engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Neutronics, thermal-hydraulics and the file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Control room, tests and the set-point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Licence, the regulator and the safety analyses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Outage, reload and spent fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The event, safety culture and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not playing with reactivity, and signing the analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- neutronics
- thermal-hydraulics
- nuclear licence
- reload
- safety analysis
- control room
- spent fuel
- safety culture
Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149
IS WORK OVER?
Museum curator
23%
#291 / 633
View rankingMuseum curator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Inventory, catalogue and write wall texts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Curate, select and negotiate loans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Install, lighting and preventive conservation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Research, publications and dossiers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Public, tours and the board.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not losing a piece or a wrong attribution.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 23% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Inventory, catalogue and write wall texts
- Curate, select and negotiate loans
- Research, publications and dossiers
- Public, tours and the board
- Not losing a piece or a wrong attribution
- conservador de museo
- curator
- comisario de exposicion
Sources for this job· O*NET 25-4012.00· ESCO/ISCO 2621