Automation index
How much of a Nuclear engineer’s job can AI already do?
A core model comes earlier. Running the plant and not playing with reactivity do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nuclear engineer
24%
AI can already do 24% of this job.
#267 / 623
View rankingNuclear engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Neutronics, thermal-hydraulics and the file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Control room, tests and the set-point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Licence, the regulator and the safety analyses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Outage, reload and spent fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The event, safety culture and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not playing with reactivity, and signing the analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- neutronics
- thermal-hydraulics
- nuclear licence
- reload
- safety analysis
- control room
- spent fuel
- safety culture
Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149
IS WORK OVER?
Music teacher
22%
#370 / 623
View rankingMusic teacher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Score, tuning and the term plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Class, the one out of tune and the one who does not practise.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Rehearsal, the concert and the one who is ill.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Assess, auditions and not humiliating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Families, the instrument and the one that will not fit at home.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Sound together, and not hating the instrument.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- scores
- tune
- concert rehearsals
- auditions
- instrument lessons
- out of tune
- families
- term plan
Sources for this job· O*NET 25-2031.00· ESCO/ISCO 2354