IS WORK OVER?

Automation index

How much of a Nuclear engineer’s job can AI already do?

A core model comes earlier. Running the plant and not playing with reactivity do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Nuclear engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Neutronics, thermal-hydraulics and the file.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Control room, tests and the set-point.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Licence, the regulator and the safety analyses.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Outage, reload and spent fuel.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
The event, safety culture and the report.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Not playing with reactivity, and signing the analysis.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • neutronics
  • thermal-hydraulics
  • nuclear licence
  • reload
  • safety analysis
  • control room
  • spent fuel
  • safety culture

Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149

NDT technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Procedure, technique and the part.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Test, the indication and the one that hides.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Report, the size and not inflating.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Field, the scaffold and the access.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The welder, the rush and not signing it sound.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
See the defect, and a true report.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • NDT
  • ultrasound
  • indications
  • procedures
  • scaffold
  • test reports
  • defect size
  • access

Sources for this job· O*NET 51-9061.00· ESCO/ISCO 3119

Analyse my job

Jobs with similar scores

  1. 269Museum educator24%
  2. 270Electrician24%
  3. 271Nurse24%
  4. 273Health inspector24%
  5. 274Interpreter24%
  6. 275Warehouse supervisor24%