IS WORK OVER?

Automation index

How much of a Nuclear engineer’s job can AI already do?

A core model comes earlier. Running the plant and not playing with reactivity do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Nuclear engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Neutronics, thermal-hydraulics and the file.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Control room, tests and the set-point.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Licence, the regulator and the safety analyses.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Outage, reload and spent fuel.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
The event, safety culture and the report.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Not playing with reactivity, and signing the analysis.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • neutronics
  • thermal-hydraulics
  • nuclear licence
  • reload
  • safety analysis
  • control room
  • spent fuel
  • safety culture

Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149

Panel beater

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Assess, order parts and quote.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pull, weld and set gaps.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Fill, sand and prep for paint.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Client, insurer and deadlines.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Shop, benches and tools.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Not delivering a car that looks bent.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Assess, order parts and quote
  • Pull, weld and set gaps
  • Fill, sand and prep for paint
  • Client, insurer and deadlines
  • Shop, benches and tools
  • Not delivering a car that looks bent
  • chapista
  • panel beater
  • chapa y pintura

Sources for this job· O*NET 49-3021.00· ESCO/ISCO 7213

Analyse my job

Jobs with similar scores

  1. 264Museum educator24%
  2. 265Electrician24%
  3. 266Nurse24%
  4. 268Health inspector24%
  5. 269Interpreter24%
  6. 270Warehouse supervisor24%