Automation index
How much of a Nuclear engineer’s job can AI already do?
A core model comes earlier. Running the plant and not playing with reactivity do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nuclear engineer
24%
AI can already do 24% of this job.
#267 / 633
View rankingNuclear engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Neutronics, thermal-hydraulics and the file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Control room, tests and the set-point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Licence, the regulator and the safety analyses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Outage, reload and spent fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The event, safety culture and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not playing with reactivity, and signing the analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- neutronics
- thermal-hydraulics
- nuclear licence
- reload
- safety analysis
- control room
- spent fuel
- safety culture
Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149
IS WORK OVER?
Parts clerk
28%
#114 / 633
View rankingParts clerk
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Catalogue, equivalents and the code.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Counter, the waiting shop and the doubt.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Stock, urgent orders and the one that is late.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Returns, warranties and the wrong part.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The mechanic, the blurry photo and not selling blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The one that fits, not the lookalike.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- parts catalogue
- OEM equivalents
- shop counter
- urgent orders
- returns
- part warranties
- parts stock
- part codes
Sources for this job· O*NET 41-2022.00· ESCO/ISCO 4321