Automation index
How much of a Nuclear engineer’s job can AI already do?
A core model comes earlier. Running the plant and not playing with reactivity do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nuclear engineer
24%
AI can already do 24% of this job.
#267 / 633
View rankingNuclear engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Neutronics, thermal-hydraulics and the file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Control room, tests and the set-point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Licence, the regulator and the safety analyses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Outage, reload and spent fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The event, safety culture and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not playing with reactivity, and signing the analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- neutronics
- thermal-hydraulics
- nuclear licence
- reload
- safety analysis
- control room
- spent fuel
- safety culture
Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149
IS WORK OVER?
Pest control technician
25%
#254 / 633
View rankingPest control technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Inspection, species and the treatment plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bait, apply, seal and look again.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Sheets, schedule and the certificate for the client.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Explain risks, times and what is not a miracle.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 22% | +4 |
Rules, biocides and waste.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
That the pest drops and nobody else pays.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- pest control
- inspect infestations
- bait
- apply biocides
- seal entry points
- treatment certificate
- identify species
- not poison anyone
Sources for this job· O*NET 37-2021.00· ESCO/ISCO 7544