IS WORK OVER?

Automation index

How much of a Nuclear engineer’s job can AI already do?

A core model comes earlier. Running the plant and not playing with reactivity do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Nuclear engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Neutronics, thermal-hydraulics and the file.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Control room, tests and the set-point.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Licence, the regulator and the safety analyses.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Outage, reload and spent fuel.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
The event, safety culture and the report.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Not playing with reactivity, and signing the analysis.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • neutronics
  • thermal-hydraulics
  • nuclear licence
  • reload
  • safety analysis
  • control room
  • spent fuel
  • safety culture

Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149

PLC programmer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Ladder, tags and the comment.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Cell, the fault and the one that will not stop.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
E-stop, the cable and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Recipe, the change and not dumping production.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The electrician, the terminals and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it stops on a fault, and not jumping the e-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program PLCs
  • tags
  • e-stops
  • faults
  • recipes
  • terminals
  • program comments
  • not jump e-stops

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514

Analyse my job

Jobs with similar scores

  1. 300Museum educator24%
  2. 301Electrician24%
  3. 302Nurse24%
  4. 304Health inspector24%
  5. 305Interpreter24%
  6. 306Warehouse supervisor24%