IS WORK OVER?

Automation index

How much of a Nuclear engineer’s job can AI already do?

A core model comes earlier. Running the plant and not playing with reactivity do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Nuclear engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Neutronics, thermal-hydraulics and the file.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Control room, tests and the set-point.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Licence, the regulator and the safety analyses.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Outage, reload and spent fuel.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
The event, safety culture and the report.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Not playing with reactivity, and signing the analysis.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • neutronics
  • thermal-hydraulics
  • nuclear licence
  • reload
  • safety analysis
  • control room
  • spent fuel
  • safety culture

Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 298Museum educator24%
  2. 299Electrician24%
  3. 300Nurse24%
  4. 302Health inspector24%
  5. 303Interpreter24%
  6. 304Warehouse supervisor24%