IS WORK OVER?

Automation index

How much of a Nuclear engineer’s job can AI already do?

A core model comes earlier. Running the plant and not playing with reactivity do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Nuclear engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Neutronics, thermal-hydraulics and the file.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Control room, tests and the set-point.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Licence, the regulator and the safety analyses.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Outage, reload and spent fuel.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
The event, safety culture and the report.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Not playing with reactivity, and signing the analysis.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • neutronics
  • thermal-hydraulics
  • nuclear licence
  • reload
  • safety analysis
  • control room
  • spent fuel
  • safety culture

Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149

Ski instructor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Level, kit and the group.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Run, the turn and the one who cuts across.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Fall, the one who cries and getting them up.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Snow, the storm and closing in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The queue, the pass and not losing a child.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Down whole, and taking nobody with them.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • turns
  • runs
  • falls
  • snow groups
  • the pass
  • the storm
  • get them up
  • ski levels

Sources for this job· O*NET 39-9032.00· ESCO/ISCO 3422

Analyse my job

Jobs with similar scores

  1. 264Museum educator24%
  2. 265Electrician24%
  3. 266Nurse24%
  4. 268Health inspector24%
  5. 269Interpreter24%
  6. 270Warehouse supervisor24%