Automation index
How much of a Nuclear engineer’s job can AI already do?
A core model comes earlier. Running the plant and not playing with reactivity do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nuclear engineer
24%
AI can already do 24% of this job.
#267 / 633
View rankingNuclear engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Neutronics, thermal-hydraulics and the file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Control room, tests and the set-point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Licence, the regulator and the safety analyses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Outage, reload and spent fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The event, safety culture and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not playing with reactivity, and signing the analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- neutronics
- thermal-hydraulics
- nuclear licence
- reload
- safety analysis
- control room
- spent fuel
- safety culture
Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149
IS WORK OVER?
Small-hydro technician
19%
#540 / 633
View rankingSmall-hydro technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Flow, set-point and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Turbine, the bearing and the one that sounds.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Gate, the jam and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Low flow, the river and not forcing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The flood, the spill and not leaving it open.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it spins, and not dry.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- turbinable flow
- bearings
- gates
- low flow
- spills
- small hydro
- turbine logs
- jams
Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131