Automation index
How much of a Nuclear engineer’s job can AI already do?
A core model comes earlier. Running the plant and not playing with reactivity do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nuclear engineer
24%
AI can already do 24% of this job.
#267 / 633
View rankingNuclear engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Neutronics, thermal-hydraulics and the file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Control room, tests and the set-point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Licence, the regulator and the safety analyses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Outage, reload and spent fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The event, safety culture and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not playing with reactivity, and signing the analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- neutronics
- thermal-hydraulics
- nuclear licence
- reload
- safety analysis
- control room
- spent fuel
- safety culture
Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149
IS WORK OVER?
Tourist-office officer
27%
#184 / 633
View rankingTourist-office officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Map, diary and the counter.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
The one with no language, the one who argues and the one with no booking.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Events, capacity and the one that cancels.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Data, survey and not inflating visitors.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The council, the shops and not only selling the centre.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Happy, and not lost.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tourist counter
- maps
- events diary
- capacity
- surveys
- bookings
- visitors
- the council
Sources for this job· O*NET 41-3041.00· ESCO/ISCO 4221