Automation index
How much of a Nuclear engineer’s job can AI already do?
A core model comes earlier. Running the plant and not playing with reactivity do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nuclear engineer
24%
AI can already do 24% of this job.
#267 / 633
View rankingNuclear engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Neutronics, thermal-hydraulics and the file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Control room, tests and the set-point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Licence, the regulator and the safety analyses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Outage, reload and spent fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The event, safety culture and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not playing with reactivity, and signing the analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- neutronics
- thermal-hydraulics
- nuclear licence
- reload
- safety analysis
- control room
- spent fuel
- safety culture
Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149
IS WORK OVER?
Urban planner
24%
#285 / 633
View rankingUrban planner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Draft reports, sheets and a first zoning plan.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 40% | +8.8 |
Analyse population, mobility and land data.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 35% | +6.3 |
Review objections and legal compatibility.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Tables with residents, councillors and city staff.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Field visits and reading the site.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Political negotiation and defending the plan.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 8% | +1 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Analyse population, mobility and land data
- Review objections and legal compatibility
- Field visits and reading the site
- urbanista
- urban planner
- planeamiento
- ordenacion del territorio
Sources for this job· O*NET 19-3051.00· ESCO/ISCO 2164