Automation index
How much of a Nuclear medicine technologist’s job can AI already do?
A dose comes earlier. Injecting the isotope without contaminating the rest do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nuclear medicine technologist
19%
AI can already do 19% of this job.
#666 / 763
View rankingNuclear medicine technologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Dose, calibrate and the patient.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Inject, the vein and the one who moves.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Acquisition, the SPECT and the artefact.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Protection, the area and not contaminating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The nuclear physician, the image and not repeating extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Inject, and not contaminating the rest.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- isotopes
- calibrate doses
- SPECT
- radiopharmaceutical injection
- radiation protection
- contamination
- acquisition
- artefacts
Sources for this job· O*NET 29-2033.00· ESCO/ISCO 3211
IS WORK OVER?
Geomatics engineer
22%
#412 / 763
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165