Automation index
How much of a Nuclear medicine technologist’s job can AI already do?
A dose comes earlier. Injecting the isotope without contaminating the rest do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nuclear medicine technologist
19%
AI can already do 19% of this job.
#647 / 743
View rankingNuclear medicine technologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Dose, calibrate and the patient.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Inject, the vein and the one who moves.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Acquisition, the SPECT and the artefact.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Protection, the area and not contaminating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The nuclear physician, the image and not repeating extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Inject, and not contaminating the rest.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- isotopes
- calibrate doses
- SPECT
- radiopharmaceutical injection
- radiation protection
- contamination
- acquisition
- artefacts
Sources for this job· O*NET 29-2033.00· ESCO/ISCO 3211
IS WORK OVER?
Mechatronics engineer
22%
#389 / 743
View rankingMechatronics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Schematic, the PLC and the loop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Cell, the arm and the one that will not stop.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Commissioning, the interlock and not jumping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cycle, the time and not inflating the figure.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the guard and not leaving them blind.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not take a finger, and starts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- PLC
- loops
- robot cells
- interlocks
- commissioning
- guards
- cycle times
- not jump the interlock
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149