Automation index
How much of a Nursery grower’s job can AI already do?
A sowing calendar comes earlier. A saleable plant that does not drown do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Nursery grower
22%
AI can already do 22% of this job.
#402 / 633
View rankingNursery grower
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Sow, water and the calendar.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Glasshouse, pest and the batch that turns.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Order, the garden centre and the plant that is not ready.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Substrate, feed and the one that drowns.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The heat, the shade and not selling too early.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Saleable, and not drowning the rootball.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- nursery sowing
- glasshouse
- rootball
- plant pests
- garden centre
- substrate
- watering calendar
- shade
Sources for this job· O*NET 45-2092.00· ESCO/ISCO 6113
IS WORK OVER?
Process engineer
26%
#205 / 633
View rankingProcess engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
P&IDs, balances and the operating procedure.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Plant, trials and the real bottleneck.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Capacity, yields and the improvement report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Start-up, shutdown and the shift that skips the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Process safety and the HAZOP that hurts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Not overloading the reactor, and signing the change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- P&IDs
- mass balances
- HAZOP
- plant start-up
- improve yields
- SOP
- bottlenecks
- process safety
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141