Automation index
How much of a Occupational physician’s job can AI already do?
A screening protocol comes earlier. Calling fit or not and facing the company do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Occupational physician
29%
AI can already do 29% of this job.
#65 / 623
View rankingOccupational physician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Screenings, protocols and the work history.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Fit notes, restrictions and PPE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The hard case, the one who cannot, and the company pushing.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Risk surveillance, sick leave and return.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Inspectorate, mutual and coordination with H&S.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Medical secrecy and signing fit for work.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 29% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- occupational screening
- fit for work
- health surveillance
- work restrictions
- return to work
- occupational medicine
- work history
- medical secrecy
Sources for this job· O*NET 29-1229.00· ESCO/ISCO 2212
IS WORK OVER?
Civil engineer
25%
#231 / 623
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142