Automation index
How much of a Occupational physician’s job can AI already do?
A screening protocol comes earlier. Calling fit or not and facing the company do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Occupational physician
29%
AI can already do 29% of this job.
#65 / 623
View rankingOccupational physician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Screenings, protocols and the work history.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Fit notes, restrictions and PPE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The hard case, the one who cannot, and the company pushing.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Risk surveillance, sick leave and return.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Inspectorate, mutual and coordination with H&S.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Medical secrecy and signing fit for work.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 29% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- occupational screening
- fit for work
- health surveillance
- work restrictions
- return to work
- occupational medicine
- work history
- medical secrecy
Sources for this job· O*NET 29-1229.00· ESCO/ISCO 2212
IS WORK OVER?
Lathe operator
26%
#214 / 623
View rankingLathe operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read the drawing, tolerances and the route card.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Set up, clamp, pick the tool and the origin.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Turn, face, thread and finish the part.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 28% | +5 |
Measure, tweak offsets and not scrap the batch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Lathe care, swarf and safety.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Grades, times and liability for the dimension.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- turn parts
- set up the lathe
- measure dimensions
- cut threads
- adjust offsets
- read mechanical drawings
- avoid scrap
- pick tools
Sources for this job· O*NET 51-4034.00· ESCO/ISCO 7223