IS WORK OVER?

Automation index

How much of a Occupational physician’s job can AI already do?

A screening protocol comes earlier. Calling fit or not and facing the company do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Occupational physician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Screenings, protocols and the work history.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Fit notes, restrictions and PPE.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
The hard case, the one who cannot, and the company pushing.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Risk surveillance, sick leave and return.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Inspectorate, mutual and coordination with H&S.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Medical secrecy and signing fit for work.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%29%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • occupational screening
  • fit for work
  • health surveillance
  • work restrictions
  • return to work
  • occupational medicine
  • work history
  • medical secrecy

Sources for this job· O*NET 29-1229.00· ESCO/ISCO 2212

Mason

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Read drawings, measure and order material.
Estimate

No public source provides a precise figure. This is our estimate.

16%30%+4.8
Setting out and levels on site.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Raise walls, render and plaster.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Floors, tiling and finishing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Safety, scaffolding and clearing the bay.
Estimate

No public source provides a precise figure. This is our estimate.

16%10%+1.6
Coordinate with foreman, plumber and electrician.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Total100%15%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Read drawings, measure and order material
  • Setting out and levels on site
  • Raise walls, render and plaster
  • Floors, tiling and finishing
  • Safety, scaffolding and clearing the bay
  • albanil
  • mason

Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112

Analyse my job

Jobs with similar scores

  1. 62Labour consultant29%
  2. 63Quality engineer29%
  3. 64ML engineer29%
  4. 66Career counsellor29%
  5. 67Construction laborer29%
  6. 68Insurance claims adjuster29%