IS WORK OVER?

Automation index

How much of a Occupational physician’s job can AI already do?

A screening protocol comes earlier. Calling fit or not and facing the company do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Occupational physician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Screenings, protocols and the work history.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Fit notes, restrictions and PPE.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
The hard case, the one who cannot, and the company pushing.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Risk surveillance, sick leave and return.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Inspectorate, mutual and coordination with H&S.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Medical secrecy and signing fit for work.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%29%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • occupational screening
  • fit for work
  • health surveillance
  • work restrictions
  • return to work
  • occupational medicine
  • work history
  • medical secrecy

Sources for this job· O*NET 29-1229.00· ESCO/ISCO 2212

Potter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Clay, wheel and centring.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pull, turn and the one that collapses.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Dry, glaze and the kiln.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Order, the set and the colour that misses.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The market, the piece and not opening too wide.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Survive the kiln, and not leaving a fat foot.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • wheel
  • centre clay
  • pull pieces
  • glaze
  • kiln
  • drying
  • tableware sets
  • the foot

Sources for this job· O*NET 51-9195.00· ESCO/ISCO 7314

Analyse my job

Jobs with similar scores

  1. 62Labour consultant29%
  2. 63Quality engineer29%
  3. 64ML engineer29%
  4. 66Career counsellor29%
  5. 67Construction laborer29%
  6. 68Insurance claims adjuster29%