Automation index
How much of a Occupational physician’s job can AI already do?
A screening protocol comes earlier. Calling fit or not and facing the company do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Occupational physician
29%
AI can already do 29% of this job.
#65 / 763
View rankingOccupational physician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Screenings, protocols and the work history.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 52% | +9.4 |
Fit notes, restrictions and PPE.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The hard case, the one who cannot, and the company pushing.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Risk surveillance, sick leave and return.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Inspectorate, mutual and coordination with H&S.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Medical secrecy and signing fit for work.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 29% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- occupational screening
- fit for work
- health surveillance
- work restrictions
- return to work
- occupational medicine
- work history
- medical secrecy
Sources for this job· O*NET 29-1229.00· ESCO/ISCO 2212
IS WORK OVER?
Tunnel engineer
22%
#410 / 763
View rankingTunnel engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Heading, the geology and the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Water, the inflow and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Blast, the vibration and the building.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Segment, the ring and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not come down, and not hiding the water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tunnel headings
- support
- inflows
- blasts
- segments
- tunnel geology
- rings
- vibrations
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142