Automation index
How much of a Olive-oil miller’s job can AI already do?
A yield comes earlier. Cold extracting without overheating do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Olive-oil miller
22%
AI can already do 22% of this job.
#348 / 633
View rankingOlive-oil miller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Intake, yield and the mill log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Crush, malaxate and the decanter.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Temperature, time and the fruitiness.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cellar, the batch and the one that goes rancid.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The campaign, the tractor queue and not heating.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Cold for real, and not painting the yield.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- crush olives
- malaxation
- decanter
- fruitiness
- the campaign
- mill yield
- oil cellar
- extraction temperature
Sources for this job· O*NET 51-3092.00· ESCO/ISCO 7514
IS WORK OVER?
Civil engineer
25%
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142