IS WORK OVER?

Automation index

How much of a Olive-oil miller’s job can AI already do?

A yield comes earlier. Cold extracting without overheating do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Olive-oil miller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Intake, yield and the mill log.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Crush, malaxate and the decanter.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Temperature, time and the fruitiness.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Cellar, the batch and the one that goes rancid.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The campaign, the tractor queue and not heating.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Cold for real, and not painting the yield.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • crush olives
  • malaxation
  • decanter
  • fruitiness
  • the campaign
  • mill yield
  • oil cellar
  • extraction temperature

Sources for this job· O*NET 51-3092.00· ESCO/ISCO 7514

Structural engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, combinations and the calculation annex.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Site, rebar and what was not poured that way.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Code, building regs and the sizing note.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Pathology, the crack and shore or not.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
The architect, the deadline and not trimming the depth.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Sign that it stands, and not hiding the assumption.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • calculate structures
  • frame model
  • calculation annex
  • building regs
  • rebar
  • structural pathology
  • load combinations
  • shore

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 345Banquet manager22%
  2. 346Table official22%
  3. 347Radio host22%
  4. 349Special-education teacher22%
  5. 350Primary school teacher22%
  6. 351Doctor22%