IS WORK OVER?

Automation index

How much of a Operating room nurse’s job can AI already do?

A checklist and a count come earlier. Scrubbing and not missing a swab do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Operating room nurse

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set the table, checklist and the patient card.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Scrub, anticipate and not break the field.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Count swabs, needles and the record.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Circulate, stocks and the turnaround.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Emergency, the bleeder and the table change.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Nothing left inside and signing the count.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • scrub
  • surgical checklist
  • swab count
  • set the table
  • circulate
  • sterile field
  • theatre
  • anticipate the surgeon

Sources for this job· O*NET 29-1141.00· ESCO/ISCO 2221

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 527DJ20%
  2. 528Voice actor20%
  3. 529Social educator20%
  4. 531ICU nurse20%
  5. 532Window dresser20%
  6. 533Dental hygienist20%