IS WORK OVER?

Automation index

How much of a Operating room nurse’s job can AI already do?

A checklist and a count come earlier. Scrubbing and not missing a swab do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Operating room nurse

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set the table, checklist and the patient card.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Scrub, anticipate and not break the field.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Count swabs, needles and the record.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Circulate, stocks and the turnaround.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Emergency, the bleeder and the table change.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Nothing left inside and signing the count.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • scrub
  • surgical checklist
  • swab count
  • set the table
  • circulate
  • sterile field
  • theatre
  • anticipate the surgeon

Sources for this job· O*NET 29-1141.00· ESCO/ISCO 2221

Wastewater-plant operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flow, process and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Basin, the sludge and the one that goes.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Breakdown, the pump and at night.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Test, the discharge and not hiding the spike.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The rain, the overflow and not opening extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come out clean, and the sludge in place.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • works flow
  • sludge
  • basins
  • pumps
  • discharges
  • overflows
  • plant logs
  • final tests

Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132

Analyse my job

Jobs with similar scores

  1. 448DJ20%
  2. 449Voice actor20%
  3. 450Social educator20%
  4. 452ICU nurse20%
  5. 453Window dresser20%
  6. 454Dental hygienist20%