Automation index
How much of a Optician’s job can AI already do?
An auto-refraction and a prescription pad come earlier. Looking at the eye, selling without pushing, and catching glaucoma do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Optician
21%
AI can already do 21% of this job.
#510 / 733
View rankingOptician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
File, history and prescription.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Lens orders, stock and appointments.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Eye exam, retinal image and fitting.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 12% | +2.4 |
Frame fit and workshop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Advise without pushing and explain pathology.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Refer to ophthalmology and follow-up.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- File, history and prescription
- Lens orders, stock and appointments
- Eye exam, retinal image and fitting
- Frame fit and workshop
- Refer to ophthalmology and follow-up
- optico
- optometrista
- optician
Sources for this job· O*NET 29-2081.00· ESCO/ISCO 3254
IS WORK OVER?
Railway engineer
22%
#389 / 733
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142