IS WORK OVER?

Automation index

How much of a Organ builder’s job can AI already do?

A windchest plan comes earlier. A pipe that speaks without eating the church do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Organ builder

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, windchests and the wind.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pipes, voice and the one that will not speak.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Action, trackers and the one that sticks.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Church, acoustics and not covering the voice.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The console, the organist and not changing the stop blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the pipe speaks, and not eating the church.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • windchests
  • organ pipes
  • voice
  • action
  • wind
  • console
  • stops
  • church acoustics

Sources for this job· O*NET 51-9071.00· ESCO/ISCO 7312

Automation engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
PLC, SCADA and the interlock.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Panel, loops and the lying sensor.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
FAT, SAT and commissioning.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Recipes, batches and the product change.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The shift, the alarm and not bypassing the interlock.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not trip, and documenting the program.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program PLCs
  • SCADA
  • interlocks
  • control loops
  • FAT SAT
  • commissioning
  • plant alarms
  • automation panels

Sources for this job· O*NET 17-3024.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 530Concrete finisher19%
  2. 531Piling operator19%
  3. 532Recycling-plant operator19%
  4. 534Palaeontologist19%
  5. 535Yacht skipper19%
  6. 536Paver19%