IS WORK OVER?

Automation index

How much of a Organ builder’s job can AI already do?

A windchest plan comes earlier. A pipe that speaks without eating the church do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Organ builder

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, windchests and the wind.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pipes, voice and the one that will not speak.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Action, trackers and the one that sticks.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Church, acoustics and not covering the voice.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The console, the organist and not changing the stop blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the pipe speaks, and not eating the church.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • windchests
  • organ pipes
  • voice
  • action
  • wind
  • console
  • stops
  • church acoustics

Sources for this job· O*NET 51-9071.00· ESCO/ISCO 7312

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 637Concrete finisher19%
  2. 638Piling operator19%
  3. 639Recycling-plant operator19%
  4. 641Palaeontologist19%
  5. 642Yacht skipper19%
  6. 643Paver19%