Automation index
How much of a Organ builder’s job can AI already do?
A windchest plan comes earlier. A pipe that speaks without eating the church do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Organ builder
19%
AI can already do 19% of this job.
#533 / 643
View rankingOrgan builder
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, windchests and the wind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Pipes, voice and the one that will not speak.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Action, trackers and the one that sticks.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Church, acoustics and not covering the voice.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The console, the organist and not changing the stop blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the pipe speaks, and not eating the church.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- windchests
- organ pipes
- voice
- action
- wind
- console
- stops
- church acoustics
Sources for this job· O*NET 51-9071.00· ESCO/ISCO 7312
IS WORK OVER?
Marine engineer
21%
#436 / 643
View rankingMarine engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Rounds, parameters and the engine log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Breakdown, the sea and repairing with what you have.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Fuel, oils and the port change.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Watch, alarms and the one who does not sleep.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Survey, class and not dressing the log.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Last the crossing, and not silencing the alarm.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- engine rounds
- engine log
- breakdowns at sea
- watches
- class
- fuels
- engine-room alarms
- repair on passage
Sources for this job· O*NET 53-5031.00· ESCO/ISCO 3151