IS WORK OVER?

Automation index

How much of a Organ builder’s job can AI already do?

A windchest plan comes earlier. A pipe that speaks without eating the church do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Organ builder

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, windchests and the wind.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pipes, voice and the one that will not speak.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Action, trackers and the one that sticks.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Church, acoustics and not covering the voice.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The console, the organist and not changing the stop blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the pipe speaks, and not eating the church.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • windchests
  • organ pipes
  • voice
  • action
  • wind
  • console
  • stops
  • church acoustics

Sources for this job· O*NET 51-9071.00· ESCO/ISCO 7312

Mixer-truck driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Order, mix and mixing time.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Drive, site and the tight access.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Pour, pump and the one who wants more water.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Wash, leftovers and not leaving a hard drum.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The jam, the delay and the concrete that sets.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Arrive fresh, and not adding extra water.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive mixers
  • batch
  • pour concrete
  • wash the drum
  • slump
  • concrete pump
  • mix order
  • site access

Sources for this job· O*NET 53-3032.00· ESCO/ISCO 8332

Analyse my job

Jobs with similar scores

  1. 530Concrete finisher19%
  2. 531Piling operator19%
  3. 532Recycling-plant operator19%
  4. 534Palaeontologist19%
  5. 535Yacht skipper19%
  6. 536Paver19%