IS WORK OVER?

Automation index

How much of a Organ builder’s job can AI already do?

A windchest plan comes earlier. A pipe that speaks without eating the church do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Organ builder

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, windchests and the wind.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Pipes, voice and the one that will not speak.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Action, trackers and the one that sticks.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Church, acoustics and not covering the voice.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The console, the organist and not changing the stop blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the pipe speaks, and not eating the church.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • windchests
  • organ pipes
  • voice
  • action
  • wind
  • console
  • stops
  • church acoustics

Sources for this job· O*NET 51-9071.00· ESCO/ISCO 7312

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 619Concrete finisher19%
  2. 620Piling operator19%
  3. 621Recycling-plant operator19%
  4. 623Palaeontologist19%
  5. 624Yacht skipper19%
  6. 625Paver19%