Automation index
How much of a Orthopaedic surgeon’s job can AI already do?
An X-ray and a note come earlier. Reducing a fracture and calling theatre do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Orthopaedic surgeon
21%
AI can already do 21% of this job.
#535 / 753
View rankingOrthopaedic surgeon
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read films, CT and a first surgical plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Reduce, immobilise and run trauma clinic.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 10% | +2 |
Theatre: prosthesis, fixation, arthroscopy.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Explain, consent and follow rehab.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Notes, consults and rounds.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
On-call, polytrauma and liability for the act.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- care for patients
- diagnose
- nursing care
- clinical notes
- Read films, CT and a first surgical plan
- Reduce, immobilise and run trauma clinic
- Theatre: prosthesis, fixation, arthroscopy
- Explain, consent and follow rehab
- Notes, consults and rounds
- traumatologo
Sources for this job· O*NET 29-1242.00· ESCO/ISCO 2212
IS WORK OVER?
Geomatics engineer
22%
#402 / 753
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165