Automation index
How much of a Orthotic and prosthetic technician’s job can AI already do?
A scan and a CAD tweak come earlier. A prosthesis that takes the step and does not rub do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Orthotic and prosthetic technician
22%
AI can already do 22% of this job.
#396 / 633
View rankingOrthotic and prosthetic technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure, scan and design the orthosis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Thermoform, laminate and assemble parts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Trial, align and the one who will not take the step.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Repair, grow-with-the-child and reviews.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Prescription, approval and working with rehab.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
No rubbing and owning the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- make prostheses
- orthoses
- scan residual limbs
- align prostheses
- thermoform
- laminate carbon
- review fittings
- O&P
Sources for this job· O*NET 51-9082.00· ESCO/ISCO 3214
IS WORK OVER?
Air traffic controller
17%
#588 / 633
View rankingAir traffic controller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan sequences and read traffic forecasts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 32% | +5.8 |
Strips, tickets and inter-unit coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Tactical control of aircraft on frequency.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 6% | +1.3 |
Resolve conflicts, radio failures and weather.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Train and supervise a controller under instruction.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
Reports, incidents and shift fatigue.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 17% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Plan sequences and read traffic forecasts
- Tactical control of aircraft on frequency
- Reports, incidents and shift fatigue
- controlador aereo
- air traffic
- atc
- torre de control
Sources for this job· O*NET 53-2021.00· ESCO/ISCO 3154