Automation index
How much of a Orthotic and prosthetic technician’s job can AI already do?
A scan and a CAD tweak come earlier. A prosthesis that takes the step and does not rub do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Orthotic and prosthetic technician
22%
AI can already do 22% of this job.
#396 / 633
View rankingOrthotic and prosthetic technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure, scan and design the orthosis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Thermoform, laminate and assemble parts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Trial, align and the one who will not take the step.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Repair, grow-with-the-child and reviews.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Prescription, approval and working with rehab.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
No rubbing and owning the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- make prostheses
- orthoses
- scan residual limbs
- align prostheses
- thermoform
- laminate carbon
- review fittings
- O&P
Sources for this job· O*NET 51-9082.00· ESCO/ISCO 3214
IS WORK OVER?
Bus driver
15%
#620 / 633
View rankingBus driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Run sheet, logs and clocking.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drive the route or the charter.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Stops, accessibility and fare or validation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 10% | +1.8 |
Incidents, diversions and passenger care.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Pre-trip check and defect reports.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Shifts, fatigue and driving rules.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drive
- route
- load goods
- Run sheet, logs and clocking
- Drive the route or the charter
- Incidents, diversions and passenger care
- Pre-trip check and defect reports
- Shifts, fatigue and driving rules
- conductor de autobus
- bus driver
Sources for this job· O*NET 53-3052.00· ESCO/ISCO 8331