IS WORK OVER?

Automation index

How much of a Orthotic and prosthetic technician’s job can AI already do?

A scan and a CAD tweak come earlier. A prosthesis that takes the step and does not rub do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Orthotic and prosthetic technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, scan and design the orthosis.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Thermoform, laminate and assemble parts.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Trial, align and the one who will not take the step.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Repair, grow-with-the-child and reviews.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Prescription, approval and working with rehab.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
No rubbing and owning the support.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • make prostheses
  • orthoses
  • scan residual limbs
  • align prostheses
  • thermoform
  • laminate carbon
  • review fittings
  • O&P

Sources for this job· O*NET 51-9082.00· ESCO/ISCO 3214

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 468Semiconductor technician22%
  2. 469Telephony technician22%
  3. 470Electoral officer22%
  4. 472Food technologist22%
  5. 473Family therapist22%
  6. 474Respiratory therapist22%