Automation index
How much of a Orthotic and prosthetic technician’s job can AI already do?
A scan and a CAD tweak come earlier. A prosthesis that takes the step and does not rub do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Orthotic and prosthetic technician
22%
AI can already do 22% of this job.
#405 / 643
View rankingOrthotic and prosthetic technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure, scan and design the orthosis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Thermoform, laminate and assemble parts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Trial, align and the one who will not take the step.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Repair, grow-with-the-child and reviews.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Prescription, approval and working with rehab.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
No rubbing and owning the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- make prostheses
- orthoses
- scan residual limbs
- align prostheses
- thermoform
- laminate carbon
- review fittings
- O&P
Sources for this job· O*NET 51-9082.00· ESCO/ISCO 3214
IS WORK OVER?
Metro driver
19%
#495 / 643
View rankingMetro driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Checks, tests and the cab log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drive, stop at platforms and regulate running.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Incidents, evacuation and talk to Control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Timetables, reliefs and the day’s orders.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Passengers, platforms and announcements.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Rules, fatigue and liability for the train.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drive metro trains
- stop at platforms
- regulate running
- evacuate tunnels
- talk to control
- cab checks
- handle incidents
- drive under ATO
Sources for this job· O*NET 53-4041.00· ESCO/ISCO 8311