Automation index
How much of a Orthotic and prosthetic technician’s job can AI already do?
A scan and a CAD tweak come earlier. A prosthesis that takes the step and does not rub do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Orthotic and prosthetic technician
22%
AI can already do 22% of this job.
#396 / 633
View rankingOrthotic and prosthetic technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure, scan and design the orthosis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Thermoform, laminate and assemble parts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Trial, align and the one who will not take the step.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Repair, grow-with-the-child and reviews.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Prescription, approval and working with rehab.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
No rubbing and owning the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- make prostheses
- orthoses
- scan residual limbs
- align prostheses
- thermoform
- laminate carbon
- review fittings
- O&P
Sources for this job· O*NET 51-9082.00· ESCO/ISCO 3214
IS WORK OVER?
Port crane operator
18%
#572 / 633
View rankingPort crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Stowage, bays and the twistlock.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, the wind and the spreader.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Shift, the ship that arrives and the one that leaves.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Breakdown, the spreader that will not lock and stopping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The docker below and covering nobody.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Not hitting the ship, and leaving the bay clear.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- stowage
- twistlocks
- spreader
- bays
- lift boxes
- quay wind
- terminal shifts
- cover nobody
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343