IS WORK OVER?

Automation index

How much of a Orthotic and prosthetic technician’s job can AI already do?

A scan and a CAD tweak come earlier. A prosthesis that takes the step and does not rub do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Orthotic and prosthetic technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, scan and design the orthosis.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Thermoform, laminate and assemble parts.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Trial, align and the one who will not take the step.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Repair, grow-with-the-child and reviews.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Prescription, approval and working with rehab.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
No rubbing and owning the support.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • make prostheses
  • orthoses
  • scan residual limbs
  • align prostheses
  • thermoform
  • laminate carbon
  • review fittings
  • O&P

Sources for this job· O*NET 51-9082.00· ESCO/ISCO 3214

Production engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
OEE, sequence and the shift plan.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Line, changeovers and the micro-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Layout, times and the work standard.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Supervisors, unions and the shift that turns.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
In-line quality and the batch that cannot ship.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Hit the plan, and not dressing the OEE.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • OEE
  • sequence production
  • changeovers
  • layout
  • work standards
  • micro-stops
  • shift plan
  • in-line quality

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 402Irrigation technician22%
  2. 403Semiconductor technician22%
  3. 404Telephony technician22%
  4. 406Food technologist22%
  5. 407Dyer22%
  6. 408Car salesperson22%