Automation index
How much of a Orthotic and prosthetic technician’s job can AI already do?
A scan and a CAD tweak come earlier. A prosthesis that takes the step and does not rub do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Orthotic and prosthetic technician
22%
AI can already do 22% of this job.
#396 / 633
View rankingOrthotic and prosthetic technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure, scan and design the orthosis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Thermoform, laminate and assemble parts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Trial, align and the one who will not take the step.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Repair, grow-with-the-child and reviews.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Prescription, approval and working with rehab.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
No rubbing and owning the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- make prostheses
- orthoses
- scan residual limbs
- align prostheses
- thermoform
- laminate carbon
- review fittings
- O&P
Sources for this job· O*NET 51-9082.00· ESCO/ISCO 3214
IS WORK OVER?
Recycling-plant operator
19%
#522 / 633
View rankingRecycling-plant operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Line, optical and the bale.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Cabin, the one that sneaks in and the glass.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Jam, the belt and stopping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quality, the reject and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, the lorry and not mixing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Sort for real, and a clean bale.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- recycling line
- bales
- sort cabin
- belts
- rejects
- glass
- optical sorters
- jams
Sources for this job· O*NET 51-9199.00· ESCO/ISCO 3132