IS WORK OVER?

Automation index

How much of a Orthotic and prosthetic technician’s job can AI already do?

A scan and a CAD tweak come earlier. A prosthesis that takes the step and does not rub do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Orthotic and prosthetic technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, scan and design the orthosis.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Thermoform, laminate and assemble parts.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Trial, align and the one who will not take the step.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Repair, grow-with-the-child and reviews.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Prescription, approval and working with rehab.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
No rubbing and owning the support.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • make prostheses
  • orthoses
  • scan residual limbs
  • align prostheses
  • thermoform
  • laminate carbon
  • review fittings
  • O&P

Sources for this job· O*NET 51-9082.00· ESCO/ISCO 3214

Site engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Setting-out, axes and the level.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Rebar, cover and the one that is missing.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Concrete, the slump and not pouring if it fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Note, the diary and not dressing the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The site manager, the rush and not covering bad steel.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the column is there, and not covering the steel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • setting-out
  • axes
  • rebar
  • cover
  • slump
  • site diary
  • levels
  • not cover steel

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 476Semiconductor technician22%
  2. 477Telephony technician22%
  3. 478Electoral officer22%
  4. 480SCADA technician22%
  5. 481Food technologist22%
  6. 482Family therapist22%