Automation index
How much of a Orthotic and prosthetic technician’s job can AI already do?
A scan and a CAD tweak come earlier. A prosthesis that takes the step and does not rub do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Orthotic and prosthetic technician
22%
AI can already do 22% of this job.
#405 / 643
View rankingOrthotic and prosthetic technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure, scan and design the orthosis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Thermoform, laminate and assemble parts.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Trial, align and the one who will not take the step.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Repair, grow-with-the-child and reviews.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Prescription, approval and working with rehab.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
No rubbing and owning the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- make prostheses
- orthoses
- scan residual limbs
- align prostheses
- thermoform
- laminate carbon
- review fittings
- O&P
Sources for this job· O*NET 51-9082.00· ESCO/ISCO 3214
IS WORK OVER?
Tram driver
19%
#496 / 643
View rankingTram driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Checks, log and the cab.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drive, stops and the pedestrian who steps out.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Badly parked car, calls and Control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Timetable, reliefs and rush hour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The tourist, the bike and not over-hooting.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Hit nobody, and make the terminus.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drive trams
- urban stops
- pedestrians
- badly parked cars
- Control
- rush hour
- cab checks
- terminus
Sources for this job· O*NET 53-4041.00· ESCO/ISCO 8311