IS WORK OVER?

Automation index

How much of a Orthotic and prosthetic technician’s job can AI already do?

A scan and a CAD tweak come earlier. A prosthesis that takes the step and does not rub do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Orthotic and prosthetic technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, scan and design the orthosis.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Thermoform, laminate and assemble parts.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Trial, align and the one who will not take the step.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Repair, grow-with-the-child and reviews.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Prescription, approval and working with rehab.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
No rubbing and owning the support.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • make prostheses
  • orthoses
  • scan residual limbs
  • align prostheses
  • thermoform
  • laminate carbon
  • review fittings
  • O&P

Sources for this job· O*NET 51-9082.00· ESCO/ISCO 3214

Tunnel engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Heading, the geology and the support.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Water, the inflow and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Blast, the vibration and the building.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Segment, the ring and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not come down, and not hiding the water.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tunnel headings
  • support
  • inflows
  • blasts
  • segments
  • tunnel geology
  • rings
  • vibrations

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 493Semiconductor technician22%
  2. 494Telephony technician22%
  3. 495Electoral officer22%
  4. 497SCADA technician22%
  5. 498Food technologist22%
  6. 499Family therapist22%