IS WORK OVER?

Automation index

How much of a Orthotic and prosthetic technician’s job can AI already do?

A scan and a CAD tweak come earlier. A prosthesis that takes the step and does not rub do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Orthotic and prosthetic technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, scan and design the orthosis.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Thermoform, laminate and assemble parts.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Trial, align and the one who will not take the step.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Repair, grow-with-the-child and reviews.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Prescription, approval and working with rehab.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
No rubbing and owning the support.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • make prostheses
  • orthoses
  • scan residual limbs
  • align prostheses
  • thermoform
  • laminate carbon
  • review fittings
  • O&P

Sources for this job· O*NET 51-9082.00· ESCO/ISCO 3214

Well driller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Location, permit and the progress log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drill, case and the collapse.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Mud, samples and the geological log.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Yield test, pump and the water analysis.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The owner, the neighbour and the well that will not yield.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Clean water, and not leaving a blind well.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drill wells
  • case
  • yield test
  • drilling mud
  • geological log
  • samples
  • well pumps
  • drilling permits

Sources for this job· O*NET 47-5023.00· ESCO/ISCO 8113

Analyse my job

Jobs with similar scores

  1. 393Irrigation technician22%
  2. 394Semiconductor technician22%
  3. 395Telephony technician22%
  4. 397Food technologist22%
  5. 398Dyer22%
  6. 399Car salesperson22%