Automation index
How much of a Osteopath’s job can AI already do?
A history and a test come earlier. A manipulation, and not overdoing it, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Osteopath
20%
AI can already do 20% of this job.
#460 / 633
View rankingOsteopath
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
History, tests and a first plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Manipulation, mobilisation and visceral work.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Explain, dose and refer if there is a red flag.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Clinical notes and progress.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Room, hygiene and informed consent.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
The practitioner’s body and not doing harm.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- History, tests and a first plan
- Clinical notes and progress
- Room, hygiene and informed consent
- The practitioner’s body and not doing harm
- osteopata
- osteopath
Sources for this job· O*NET 29-1299.00· ESCO/ISCO 2269
IS WORK OVER?
Aerospace engineer
25%
#228 / 633
View rankingAerospace engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calculate, simulate and certify structures and systems.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Drawings, tolerances and traceability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bench, test flight and incidents.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vendors, quality and EASA.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Documentation, versions and configuration.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign something that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Drawings, tolerances and traceability
- Bench, test flight and incidents
- Vendors, quality and EASA
- Documentation, versions and configuration
- Sign something that will not fall
- ingeniero aeronautico
- aerospace engineer
Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144