IS WORK OVER?

Automation index

How much of a Osteopath’s job can AI already do?

A history and a test come earlier. A manipulation, and not overdoing it, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Osteopath

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
History, tests and a first plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Manipulation, mobilisation and visceral work.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Explain, dose and refer if there is a red flag.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Clinical notes and progress.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Room, hygiene and informed consent.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
The practitioner’s body and not doing harm.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • History, tests and a first plan
  • Clinical notes and progress
  • Room, hygiene and informed consent
  • The practitioner’s body and not doing harm
  • osteopata
  • osteopath

Sources for this job· O*NET 29-1299.00· ESCO/ISCO 2269

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 536Cycle courier20%
  2. 537Kitchen fitter20%
  3. 538Neonatologist20%
  4. 540Skipper20%
  5. 541Perfusionist20%
  6. 542Pizza maker20%